# Condo special assessments: who pays, and how to see one coming

By [Lysting research](https://lysting.com/how-we-check) 14 minute read Checked against its sources on November 16, 2026

A condo special assessment is a charge on top of regular dues. Where the reserve study, milestone inspection, budget and minutes show one coming, and who pays.

What it is

Any assessment an association levies other than the one its annual budget requires. Florida Statutes s. 718.103(27).

Where it shows first

In four documents: the reserve study, the milestone inspection report, the annual budget and the board minutes.

Who pays at a sale

The contract decides. In the Florida Realtors and Florida Bar condominium rider, a blank box means the seller pays assessments levied before closing.

Dates

An existing association's first structural integrity reserve study was due by December 31, 2025, and in no event later than December 31, 2026. Reserves may be paused only in budgets adopted on or before December 31, 2028.

What it is

## What is a special assessment?

A special assessment is a charge an association levies on unit owners on top of regular dues. Florida's Condominium Act defines it as any assessment other than the one the annual budget requires. A condo special assessment pays a bill that the operating budget and the reserves do not cover.

The Condominium Act defines it in one line: "any assessment levied against a unit owner other than the assessment required by a budget adopted annually."[1](https://lysting.com/guides/condo-special-assessments#src-fs-718) The assessment the budget does require is the regular one, which owners call condo fees, HOA fees or dues.

### What condo and HOA fees cover

Regular assessments pay the association's common expenses: "the operation, maintenance, repair, replacement, or protection of the common elements and association property," the cost of running the association, and its insurance.[1](https://lysting.com/guides/condo-special-assessments#src-fs-718) The budget also carries reserve accounts for roof replacement, building painting, pavement resurfacing and any other item that costs more than $25,000 to replace or maintain, a figure the state adjusts for inflation.[2](https://lysting.com/guides/condo-special-assessments#src-fs-718-112)

People say "HOA" for both kinds of association, but a Florida homeowners' association follows chapter 720, so an HOA special assessment there falls under different rules.

**Reserve study**

A schedule of what a building's components will cost to replace, when, and how much to set aside each year.

**Structural integrity reserve study (SIRS)**

The reserve study Florida requires at least every 10 years for condominium buildings of three habitable stories or more.[2](https://lysting.com/guides/condo-special-assessments#src-fs-718-112)

**Milestone inspection**

An engineer's or architect's structural inspection, due when such a building reaches 30 years, or 25 where the local agency decides, and every 10 years after.[3](https://lysting.com/guides/condo-special-assessments#src-fs-553-899)

**Baseline funding**

The minimum plan every SIRS must include. Each year's contribution keeps the reserve cash balance above zero.

**Loss assessment coverage**

Part of a unit owner's own policy, which agents call an HO-6, that pays some assessments after a covered loss. Florida sets a floor of $2,000.[4](https://lysting.com/guides/condo-special-assessments#src-fs-627-714)

Why fees rise

## Why are condo fees so high in Florida?

Florida law now fixes parts of a condo budget that owners used to be able to vote down. For budgets adopted on or after December 31, 2024, an association that needs a structural integrity reserve study may not waive reserves for the roof, structure and other listed items. Insurance and repairs sit in the same budget.

Whether a fee is too high is not something a statute, or this guide, can say. The statute does show which lines of a budget a board and its owners no longer control.

Reserves come first. Owners may still vote, by a majority of all voting interests, to fund some reserves partly or not at all. For the structural items in a building that needs a [structural integrity reserve study](https://lysting.com/glossary#structural-integrity-reserve-study), in a budget adopted on or after December 31, 2024, they "may not determine to provide no reserves or less reserves than required."[2](https://lysting.com/guides/condo-special-assessments#src-fs-718-112)

The statute states the trade-off itself. A proxy asking owners to waive reserves has to carry this sentence in bold capitals:

> Waiving of reserves, in whole or in part, or allowing alternative uses of existing reserves may result in unit owner liability for payment of unanticipated special assessments regarding those items.

Florida Statutes s. 718.112(2)(f)5.[2](https://lysting.com/guides/condo-special-assessments#src-fs-718-112)

### Do condo and HOA fees go up every year?

Nothing in the budget rules says they cannot. A board that proposes assessments above 115% of the previous year's has to offer owners a substitute budget without discretionary spending. The 115% sum leaves out reserves, insurance premiums and one-off structural repairs.[2](https://lysting.com/guides/condo-special-assessments#src-fs-718-112) It is a ceiling only where a developer controls the board, and there a majority of all voting interests can lift it.

Seeing one coming

## How can you tell a special assessment is coming?

Four documents can show a special assessment before a board levies it: the reserve study, the milestone inspection report, the annual budget and the board minutes. Read each against the others. Where one names a cost that another does not fund, the association or its manager can say how it will be paid.

Before a board votes on a nonemergency special assessment it has to give owners 14 days' written notice, with "the estimated cost and description of the purposes."[2](https://lysting.com/guides/condo-special-assessments#src-fs-718-112) That notice is the last document to mention the cost. Four others can carry it earlier.

Four documents that show an assessment before it is levied

| Document | The page to read | What it tells you |
| --- | --- | --- |
| Reserve study (SIRS) | The state form's opening pages and ten-year funding table, then Exhibit A, the reserve schedule.[5](https://lysting.com/guides/condo-special-assessments#src-form-6000-10) | What each component will cost, when, and how much to set aside each year. |
| [Milestone inspection](https://lysting.com/glossary#milestone-inspection) report | The inspector's summary of findings and recommendations, sent to owners within 45 days.[3](https://lysting.com/guides/condo-special-assessments#src-fs-553-899) | Whether the engineer found substantial structural deterioration, and the repairs recommended. |
| Annual budget | The reserve contribution lines, and any line for a repair project or a loan. | How much of the study's figure is being collected, and whether a named repair has a line. |
| Board minutes, 12 months | Motions and discussion about engineers, bids, loans and assessments. | What the board has discussed or voted and not yet levied. |

Associations of 25 or more units must post all four for owners behind a login, along with "all affidavits required by this chapter" (s. 718.111(12)(g)).[1](https://lysting.com/guides/condo-special-assessments#src-fs-718)

### The form that states it outright

Under the reserve rule as amended effective October 4, 2026, every SIRS goes on a state form, and an officer or director signs an affidavit with it.[6](https://lysting.com/guides/condo-special-assessments#src-fac-61b-22-005) The affidavit has four boxes under "Reserve Schedule from SIRS will result in": special assessment, loan, line of credit, regular assessments. Below them is a blank for the "Amount of Special Assessment/Loan/Line of Credit Required."[7](https://lysting.com/guides/condo-special-assessments#src-form-6000-11) It is not among the documents a resale buyer is owed under s. 718.503.

Worth knowing

Whether a study has been filed is public. When we counted, the state's SIRS reporting database held 4,341 entries submitted from July 2025 and 6,086 from before.[8](https://lysting.com/guides/condo-special-assessments#src-dbpr-sirs-database) They are self-reported, "displayed exactly as submitted,"[9](https://lysting.com/guides/condo-special-assessments#src-dbpr-inspections) and undated, so an entry shows that a filing exists and nothing about what it says.

The entries in both lists are counted by county on [Florida reserve study filings by county](https://lysting.com/data/florida-reserve-study-filings).

Harbor Point, an invented example: the study against the budget

SIRS form, 2026 p. 2

Required annual baseline funding, year 1: $212,000

2027 budget p. 4

Structural reserves contribution: $140,000

Doesn't match

Invented figures. The budget collects $72,000 less than the study's baseline figure ($212,000 less $140,000). Chapter 718 requires an updated SIRS before a board adopts a budget whose reserve funding "does not align with the funding plan."[2](https://lysting.com/guides/condo-special-assessments#src-fs-718-112) How the difference is made up is the association's to say.

With the documents open

- **The SIRS and its date.** The reserve balance and the funding figure for the coming year.
- **The affidavit filed with it.** Which funding box is ticked, and the amount.
- **The budget for the same year.** The structural reserve contribution beside the study's figure.
- **The milestone summary.** Each repair it recommends, and the budget line, loan or assessment that pays for it.
- **Twelve months of board minutes.** Every mention of an engineer, a bid, a loan or an assessment.
- **The [estoppel certificate](https://lysting.com/glossary#estoppel-certificate).** Assessments owed and those scheduled to come due.

The report for this

Condo package review$149 per report

Compare the board’s minutes, budget and disclosures while you still have time to ask about repairs, fees or missing records.

Lysting does not give legal, lending or engineering advice. It shows what the documents say, side by side, and names who decides.

[Order a report](https://lysting.com/workspace/login?report=condo)[Get in touch](https://lysting.com/contact) [Explore this report](https://lysting.com/reports/condo)

Reserve studies

## What is a reserve study, and how do you read one?

A reserve study lists the parts of a building an association must maintain, what each will cost to replace and when, and how much to set aside each year. Florida requires a structural integrity reserve study at least every 10 years for condo buildings of three habitable stories or more.

An HOA reserve study and a condo reserve study are the same kind of document. Florida's structural integrity reserve study is that document with its contents fixed by statute.[2](https://lysting.com/guides/condo-special-assessments#src-fs-718-112) It covers the roof, the structure, fireproofing and fire protection, plumbing, electrical systems, waterproofing and exterior painting, windows and exterior doors, and any other item above the $25,000 threshold whose failure would harm those.

Every SIRS must include, at a minimum, a schedule "based on a baseline funding plan" in which each year's funding "is sufficient to maintain the reserve cash balance above zero." The statute names where the money can come from: "regular assessments, special assessments, lines of credit, or loans."[2](https://lysting.com/guides/condo-special-assessments#src-fs-718-112) For loan applications dated on or after August 3, 2026, a lender may not rely on the baseline plan.[10](https://lysting.com/guides/condo-special-assessments#src-fnma-ll-2026-03) [The guide to non-warrantable condos](https://lysting.com/guides/non-warrantable-condo) covers that review.

The guide on [how to read a Florida condo reserve study](https://lysting.com/guides/how-to-read-a-condo-reserve-study) goes through the state form, its ten-year funding table and Exhibit A, and sets each against the budget. The reserve study and reserve funding dates still to come are listed, with their sources, on [Florida condo and mortgage deadlines for 2026 and 2027](https://lysting.com/downloads/florida-condo-and-mortgage-deadlines-2026-2027).

Who decides

What a component will cost and how long it will last are the preparer's findings. For how a figure was reached, ask the engineer, architect or reserve specialist who signed the study, or the association.

Milestone vs SIRS

## What is the difference between a milestone inspection and a SIRS?

A milestone inspection is an engineer's or architect's structural inspection of an aging building, filed with the local building department. A structural integrity reserve study is a funding plan for future repairs, reported to the state. Both apply to Florida condo buildings of three habitable stories or more, on different clocks.

|  | Milestone inspection | SIRS |
| --- | --- | --- |
| When | By December 31 of the year the building turns 30, or 25 where the local enforcement agency decides conditions such as proximity to salt water require it. Then every 10 years. | At least every 10 years after the condominium is created. |
| Who does it | A licensed engineer or architect. | The same, or a certified reserve specialist or analyst. |
| How it runs | Phase one is visual. Phase two follows only if phase one finds substantial structural deterioration. | One study, with updates between. |
| What follows | Repairs must begin within 365 days after the building department receives a phase two report. | A reserve contribution the budget has to follow. |

Milestone inspection in Florida: s. 553.899.[3](https://lysting.com/guides/condo-special-assessments#src-fs-553-899) SIRS: s. 718.112(2)(g).[2](https://lysting.com/guides/condo-special-assessments#src-fs-718-112)

The two meet in the budget. For a budget adopted on or before December 31, 2028, if a milestone inspection was completed within the previous 2 calendar years, the board may pause or reduce reserve contributions, for no more than two consecutive annual budgets, "for the purpose of funding repairs recommended by the milestone inspection." That takes a majority of all voting interests, and a new SIRS before contributions resume.[2](https://lysting.com/guides/condo-special-assessments#src-fs-718-112)

Florida's dates

1. Dec 31, 2024 First milestone deadline; waivers end Buildings that reached 30 before July 1, 2022. Budgets adopted on or after this date may not waive SIRS reserves.
2. Dec 31, 2025 SIRS due Owner-controlled associations existing on or before July 1, 2022.
3. Dec 31, 2026 Last day for a first SIRS Where the study is done alongside a milestone inspection due by this date. "In no event" later.
4. Dec 31, 2028 The reserve pause closes The last day to adopt a budget that pauses reserves to pay for milestone repairs.

A building's own milestone date is December 31 of the year it turns 30, or 25 where the local agency decides. Sections 553.899(3) and 718.112(2)(f) and (g), 2026 Florida Statutes.

Harbor Point, an invented example: a repair the budget does not name

Milestone summary, phase two p. 2

Substantial structural deterioration observed at balcony slab edges, stacks 01 to 04. Repair recommended

No passage found in the documents supplied.

Not found

Invented. No line for this repair appears in the 2027 budget, pages 1 to 6. Reserves, a loan or an assessment: the association decides.

Related[Milestone inspections in Florida: which buildings, when, and the two phases](https://lysting.com/guides/florida-milestone-inspections)

Who decides

Whether a condition is substantial structural deterioration, and what repair it needs, is for the engineer or architect who inspected. Deadlines and extensions are for the local building department.

Who pays at closing

## Who pays a special assessment when a condo is sold?

The contract decides who pays special assessments at closing. Under the Florida Realtors and Florida Bar condominium rider, the seller pays assessments levied before closing unless the buyer's box is checked. By statute the buyer becomes jointly liable with the seller for any assessment left unpaid when title transfers.

Start with the statute. A unit owner "is liable for all assessments which come due while he or she is the unit owner" and is "jointly and severally liable with the previous owner for all unpaid assessments that came due up to the time of transfer of title."[11](https://lysting.com/guides/condo-special-assessments#src-fs-718-116)

The contract divides the cost. Florida Realtors and The Florida Bar publish a condominium rider, form CR-7, revised July 2025. It is a member form; this guide read the redline Florida Realtors posts.[12](https://lysting.com/guides/condo-special-assessments#src-cr-7) In its paragraph 3(c):

- Assessments levied before closing: the parties check Buyer or Seller, and "if left blank, then Seller" pays in full.
- Installments the association lets a buyer take over: the seller pays those due on or before closing. For the rest, a blank box means the buyer.

The rider also has the seller list assessments "levied by the Condominium Association, or discussed at a Board meeting in the 12 months prior to the Effective Date."

Often misread

"The seller pays" is a default, and only for what has been levied

A checked box moves the cost to the buyer. So does an installment plan the buyer assumes. And a cost that is still only a line in a reserve study or a milestone report on closing day falls on whoever owns the unit when the assessment comes due.

The amounts come from the estoppel certificate, which the association must issue within 10 business days. It itemizes assessments owed and those "scheduled to become due" during its effective period, 30 days or 35 if mailed.[11](https://lysting.com/guides/condo-special-assessments#src-fs-718-116) The statute does not require it to report what a board has only discussed. [The guide to estoppel letters and condo questionnaires](https://lysting.com/guides/estoppel-letter-and-condo-questionnaire) covers how to order one.

Who decides

Who owes what under a signed contract is for a Florida real estate attorney or the closing agent. The contract controls, not the form's defaults and not this guide.

The lender's view

## Does a special assessment affect a buyer's mortgage?

It can. For a conventional loan the lender must learn each special assessment's purpose, approval date, original and remaining amounts and payoff date. Fannie Mae treats a project as ineligible if an assessment is tied to a critical repair that has not been remediated, or if more than 15% of units are 60 days behind on it.

Fannie Mae's test for unfunded critical repairs, those above $10,000 per unit that should be done within 12 months, "does not include repairs made by the unit owner or repairs funded through a special assessment."[13](https://lysting.com/guides/condo-special-assessments#src-fnma-ineligible) The 15% delinquency line is part of the full review.[14](https://lysting.com/guides/condo-special-assessments#src-fnma-full-review)

Fannie Mae's reason for raising its reserve line to 15% for applications dated on or after January 4, 2027 is this guide's subject. Where reserves are inadequate, "unit owners can experience substantial financial hardship from unexpected special assessments or higher regular assessments or dues."[10](https://lysting.com/guides/condo-special-assessments#src-fnma-ll-2026-03)

Related[Non-warrantable condos: the project rules a lender checks](https://lysting.com/guides/non-warrantable-condo)

Who decides

Only the buyer's lender decides whether a project meets Fannie Mae's rules, and it decides for its own loan.

Limits and disputes

## How much can an association charge, and can you fight a special assessment?

The assessment sections of chapter 718 state no dollar limit. They set procedure: 14 days' written notice with the estimated cost and purpose, money spent only on that purpose, and a majority of all voting interests for a special assessment that funds structural reserves. Whether a particular assessment is valid is a question for a Florida real estate attorney.

These are the Florida condo special assessment rules in the statute itself:

- Written notice of a board meeting on a nonemergency assessment goes to every owner at least 14 days ahead, with the estimated cost and the purposes.[2](https://lysting.com/guides/condo-special-assessments#src-fs-718-112)
- The money "shall be used only for the specific purpose or purposes set forth in such notice."[11](https://lysting.com/guides/condo-special-assessments#src-fs-718-116)
- A special assessment, loan or line of credit that funds reserves for SIRS items "requires the approval of a majority vote of the total voting interests."[2](https://lysting.com/guides/condo-special-assessments#src-fs-718-112)
- In a declared state of emergency, unless the condominium documents specifically prohibit it, a board may "levy special assessments without a vote of the owners" (s. 718.1265).[1](https://lysting.com/guides/condo-special-assessments#src-fs-718)

The statute speaks of an assessment "approved in accordance with the condominium documents," so any owner vote or ceiling for a particular building would be in its [declaration](https://lysting.com/glossary#declaration-of-condominium) and [bylaws](https://lysting.com/glossary#condo-bylaws).

On not paying, the statute is short. Liability "may not be avoided by waiver of the use or enjoyment of any common element or by abandonment of the unit." Unpaid assessments bear interest, at 18% a year where the declaration sets no rate, and the association has a lien it may foreclose.[11](https://lysting.com/guides/condo-special-assessments#src-fs-718-116)

One route owners expect is closed. The state's arbitration program for condominium disputes leaves out "the levy of a fee or assessment" (s. 718.1255).[1](https://lysting.com/guides/condo-special-assessments#src-fs-718) The state's condominium division does take complaints where an owner believes an assessment related to the SIRS "includes maintenance of items beyond those needed for structural integrity."[9](https://lysting.com/guides/condo-special-assessments#src-dbpr-inspections)

Who decides

Whether an assessment was validly levied, and what an owner can do about one that was not, is legal advice. Ask a Florida real estate attorney, with the notice, the minutes and the declaration in hand.

Insurance

## Does insurance cover a special assessment?

Sometimes, and only where the policy says so. Florida requires a unit owner's policy to include at least $2,000 of loss assessment coverage for assessments that follow a direct loss of a type the policy covers. Whether an assessment for aging components or reserves counts is for the policy's wording and an insurance agent to say.

Special assessment condo insurance coverage goes by the name loss assessment coverage, and it sits in the unit owner's own policy. Florida sets its floor: the policy "must include at least $2,000 in property loss assessment coverage for all assessments made as a result of the same direct loss to the property," where the loss "is of the type of loss covered by the unit owner's residential property insurance policy."[4](https://lysting.com/guides/condo-special-assessments#src-fs-627-714)

"Direct loss" ties the coverage to damage. The limit that applies is the one in force the day before the event, so a limit raised afterward does not count for that loss.

After a storm, one source of an assessment is the master policy's deductible, which chapter 718 makes a common expense (s. 718.111(11)(j)).[1](https://lysting.com/guides/condo-special-assessments#src-fs-718) The federal flood policy for a condo unit pays loss assessments, but not one "that results from a deductible under the insurance purchased by the condominium association."[15](https://lysting.com/guides/condo-special-assessments#src-sfip-dwelling)

The guide on [what a condo master policy covers](https://lysting.com/guides/condo-master-insurance-and-lender-requirements) also sets out what a unit owner's HO-6 covers instead, and how high a master policy's deductible may be.

Who decides

What a policy's loss assessment coverage pays, its limit and its exclusions are in the policy. Ask the insurance agent who wrote it.

Related[Buying a condo in Florida: the documents a buyer is owed](https://lysting.com/guides/buying-a-condo-in-florida)

## More questions

**What happens if you don't pay condo assessments in Florida?**

Under section 718.116 of the Florida Statutes, an unpaid assessment bears interest from its due date at the rate the declaration sets, or 18% a year where it sets none, and the association holds a lien on the unit to secure payment. Where the declaration or bylaws provide for one, the association may add a late fee of up to $25 or 5% of each late installment, whichever is greater. Not using the common elements, or abandoning the unit, does not end the owner's liability.

**Can a board levy a special assessment without an owner vote?**

It depends on the purpose and the condominium documents. Chapter 718 requires a majority of all voting interests for a special assessment that funds reserves for structural integrity reserve study items, and lets a board assess without an owner vote in a declared emergency unless the documents specifically prohibit it. For anything else, a Florida real estate attorney can read what the declaration and bylaws require.

**Does a seller have to tell a buyer about a special assessment?**

The Florida Realtors and Florida Bar condominium rider has the seller list assessments levied, or discussed at a board meeting in the 12 months before the contract. By statute a resale buyer is also owed the milestone inspection summary and the most recent structural integrity reserve study. What else a seller must disclose is a question for a Florida real estate attorney.

**Can a special assessment be paid in installments?**

Some are. The condominium rider provides for it: where the association allows a buyer to assume installments, the seller pays those due on or before closing and, unless the contract says otherwise, the buyer pays the rest.

**Do Florida HOAs need a milestone inspection or a structural integrity reserve study?**

Both requirements are written for residential condominium and cooperative buildings of three habitable stories or more. Homeowners' associations are governed by chapter 720, which this guide does not cover.

**What if the association has not done its milestone inspection or SIRS?**

A resale contract has to say so in conspicuous type, under s. 718.503(2)(e). Chapter 718 also treats an officer's or director's willful and knowing failure to complete either one as a breach of the fiduciary relationship to the unit owners.

**Can Lysting tell me whether a special assessment is coming?**

No. A Lysting condo package review sets what the reserve study, the milestone report, the budget and the minutes say side by side, with page references, and shows where they differ. Whether and when to assess is the association's decision.

## Sources

Every rule, date and limit above comes from one of these. The examples marked invented use invented figures. Where a rule is quoted, the wording is the source's.

1. 1 [Florida Statutes chapter 718, Condominium Act: ss. 718.103, 718.111, 718.115, 718.1255, 718.1265, 718.503](http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0718/0718.html) Florida Legislature, 2026 Statutes
2. 2 [Florida Statutes s. 718.112(2), meetings, annual budget, reserves and the structural integrity reserve study](http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0718/Sections/0718.112.html) Florida Legislature, 2026 Statutes
3. 3 [Florida Statutes s. 553.899, Mandatory structural inspections for condominium and cooperative buildings](http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0500-0599/0553/Sections/0553.899.html) Florida Legislature, 2026 Statutes
4. 4 [Florida Statutes s. 627.714, Residential condominium unit owner coverage; loss assessment coverage required](http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0600-0699/0627/Sections/0627.714.html) Florida Legislature, 2026 Statutes
5. 5 [DBPR Form CO 6000-10, Structural Integrity Reserve Study (SIRS) Form](https://www.flrules.org/gateway/reference.asp?No=Ref-19575) Florida Department of Business and Professional Regulation, Effective August 2026
6. 6 [Florida Administrative Code rule 61B-22.005, Reserves](https://www.flrules.org/gateway/RuleNo.asp?id=61B-22.005) Florida Department of State, Amended effective October 4, 2026
7. 7 [DBPR Form 6000-11, Affidavit of Acknowledgement](https://www.flrules.org/gateway/reference.asp?No=Ref-19576) Florida Department of Business and Professional Regulation, Effective August 2026
8. 8 [Structural integrity reserve study reporting, with the SIRS Reporting Database](https://www2.myfloridalicense.com/condos-timeshares-mobile-homes/condominiums-and-cooperatives-sirs-reporting/) Florida Department of Business and Professional Regulation
9. 9 [Inspections: milestone inspections and structural integrity reserve studies](https://condos.myfloridalicense.com/inspections/) Florida Department of Business and Professional Regulation
10. 10 [Lender Letter LL-2026-03, Updates to Project Standards and Property Insurance Requirements](https://singlefamily.fanniemae.com/media/44986/display) Fannie Mae, March 18, 2026
11. 11 [Florida Statutes s. 718.116, Assessments; liability; lien and priority; interest; collection](http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0718/Sections/0718.116.html) Florida Legislature, 2026 Statutes
12. 12 [Condominium Rider (Rider A), form CR-7, redline](https://www.floridarealtors.org/sites/default/files/2025-06/CR-7_A.%20Condominium%20Rider_Redlined_0.pdf) Florida Realtors and The Florida Bar, Revision of July 2025
13. 13 [Selling Guide B4-2.1-03, Ineligible Projects](https://selling-guide.fanniemae.com/sel/b4-2.1-03/ineligible-projects) Fannie Mae, Guide of November 4, 2026
14. 14 [Selling Guide B4-2.2-01, Full Review Process](https://selling-guide.fanniemae.com/sel/b4-2.2-01/full-review-process) Fannie Mae, Guide of November 4, 2026
15. 15 [44 CFR Part 61, Appendix A(1), Standard Flood Insurance Policy, Dwelling Form, section III.C.3](https://www.ecfr.gov/current/title-44/part-61/appendix-Appendix%20A(1)%20to%20Part%2061) Federal Emergency Management Agency, via eCFR, eCFR as of November 12, 2026

This guide states what the published rules and forms say. It is not legal, lending, insurance, engineering or valuation advice, and it does not decide anything about a particular property. Rules change; read the source, and ask the person named in each section.

## Order a report for your next closing.

Reports start at $99. You’ll get your report in hours.

[Order a report](https://lysting.com/workspace/login?report=condo)[Get in touch](https://lysting.com/contact)
