How to read a condo reserve study in Florida: the state form, the funding schedule and the budget
By Lysting research13 minute readChecked against its sources on
What a Florida structural integrity reserve study holds, how to read the state form and its funding schedule, and how the budget's reserve line compares.
What it is
A study of the reserve funds a condo building of three habitable stories or more needs for its structural parts, required at least every 10 years.
The form
Since October 4, 2026 every study and every update goes on DBPR Form CO 6000-10, with the funding method, a ten-year table for pooled reserves, and the reserve schedules as Exhibit A.
The budget
Reserves for the study's items follow the most recent study. For budgets adopted on or after December 31, 2024, owners may not vote to waive them.
The lender's test
Florida's minimum is a baseline plan that keeps the balance above zero. Fannie Mae and Freddie Mac do not accept that plan in place of their reserve line.
In this guide
What a SIRS is
What is a structural integrity reserve study?
A structural integrity reserve study, or SIRS, is Florida's required reserve study for residential condo buildings of three habitable stories or more. It lists the building's structural components, what each will cost to replace and when, and how much the association must set aside each year. A full study is due at least every 10 years.
The statute defines it in one line: "a study of the reserve funds required for future major repairs and replacement of the condominium property."1 Florida's condominium regulator calls any reserve study "a budget planning tool" that looks at the parts of a building the association maintains, the reserve fund as it stands, and the funding needed for what is coming.2
The word structural is what narrows it. An ordinary reserve study can cover a pool, a clubhouse or a parking lot. A SIRS has to cover, at a minimum, eight things "as related to the structural integrity and safety of the building":3
- the roof;
- the structure, "including load-bearing walls and other primary structural members and primary structural systems";
- fireproofing and fire protection systems;
- plumbing;
- electrical systems;
- waterproofing and exterior painting;
- windows and exterior doors;
- any other item with a deferred maintenance expense or replacement cost above $25,000, a figure the state adjusts for inflation each year, whose neglect "negatively affects" the seven above.
Does this building need one?
Is the building less than three stories in height, or a one-to-four-family dwelling of three or fewer habitable stories above ground?
- Yes
- The requirement does not apply to it.
- No
- Go on.
Is the part in question maintained by someone other than the association, or outside the condominium form of ownership?
- Yes
- The study does not have to cover that part.
- No
- Go on.
Did the association exist on or before July 1, 2022, under the control of unit owners other than the developer?
- Yes
- Its first study was due by December 31, 2025. Where a milestone inspection was due by December 31, 2026 the two could be done together, and in no event later than that date.
- No
- A study is due at least every 10 years after the condominium's creation.
A SIRS is about money. The inspection for damage is the milestone inspection, which the state describes as "a structural inspection of an aging building used to determine if substantial structural deterioration exists."2 It runs on its own clock, and its report goes to the association and to the local building official.4
RelatedMilestone inspections in Florida: which buildings, when, and what the two phases are
Who and how often
Who prepares a reserve study, and how often is one required?
A Florida structural integrity reserve study must be performed or verified by a licensed engineer or architect, or by a reserve specialist or professional reserve analyst certified by the Community Associations Institute or the Association of Professional Reserve Analysts. A full study is required at least every 10 years. Updates fall due sooner when the facts change.
The state describes two parts to a SIRS, "the financial study and the visual inspection."2 The same list of people may perform or verify both.3 The state form opens with three boxes, one for each kind of study the rule recognizes.5
Scroll across for all columns.
| Box on the form | What it is | When the rule allows or requires it |
|---|---|---|
| Full SIRS | Every statutory item, with a visual inspection. | At least once every 10 years. Only a full study satisfies the 10-year requirement. |
| Update with Site Visit | A revision with a new visual inspection. | Required when an incident or disaster since the last inspection "may reasonably be expected to affect the structural integrity or life-safety systems of the building." |
| Financial Update Without Site Visit | A revision of the reserve schedule alone. | Allowed when the study with the most recent visual inspection was completed within the preceding 36 months and the changes are limited to funding amounts or estimated replacement costs. |
Rule 61B-22.005(9), as amended effective October 4, 2026.
An update is not left to the board's choice. The rule requires one when the projected year-end reserve balance differs from the study's projection by 50% or more of the association's most recent annual cash inflows to reserves, and when a repair, replacement or maintenance item happens more than two years earlier or later than the study scheduled it.5 The statute adds a third case: a special assessment, loan or line of credit arranged after the study was done.3
The statute also requires a preparer who bids for the study to disclose in writing any intent to bid on the work it may recommend.3 The form records the answer in two pairs of boxes: whether the firm disclosed an intention to bid, and whether it intends to.6
The state form
What is on the state reserve study form?
Since October 4, 2026, every structural integrity reserve study in Florida, including any update, must be completed on DBPR Form CO 6000-10. The form states the kind of study, who prepared it, the association's current structural reserves and contributions, and the funding method, with a ten-year table for pooled reserves and the reserve schedules attached as Exhibit A.
The rule says all studies, "including any updates or amendments, must be properly completed using the current DBPR Form CO 6000-10."5 The form is short. Read from the top, it holds:6
The kind of study
Full SIRS, Update with Site Visit, or Financial Update Without Site Visit. This tells you which of the clocks above the document answers to.Professional information
The firm, the date or dates of the visual inspection, the "SIRS Delivery Date," the preparer's license type and number, a seal, and a signed statement that the report "presents a description of the current conditions based upon the visual inspection." The two boxes about bidding sit here.Association information
The projects the study covers, the number of residential buildings on the property against the number in the study, with an explanation if they differ, the total units, the "Current Amount in Structural Reserves," the current and projected annual structural reserve contributions, and the calendar year of the last SIRS.SIRS results
The funding method: Straight-Line, Pooled, or Combination/Other. A straight-line study gives a year one funding amount. A pooled study fills in a ten-year table. A yes-or-no box records whether the study recommends reserves for items the statute does not require.Exhibit A
The reserve schedule or schedules the study recommends, component by component. This is where remaining useful lives and replacement costs are.
A study delivered before the form existed is still in its preparer's layout. A 2024 engineer's study read for this guide runs in this order: an executive summary, a summary of the statute, the scope of what was observed and what was left out, the findings by component, the method and funding goal, and the schedule as an appendix. The facts to find are the same. They are in different places.
A draft is not the study. The rule defines a completed SIRS as the version "signed, dated, and delivered to the association," and says preliminary drafts prepared for the board do not count.5
The funding schedule
How do you read a reserve funding schedule?
For each component, a reserve schedule gives the estimated remaining useful life, the replacement cost or deferred maintenance expense, and a recommended annual reserve that reaches that cost by the end of that life. Florida allows two accounting methods: straight-line, with an account for each component, and pooled, with one account for several.
Those three figures per component are the statutory minimum for a SIRS.3 How the annual amount is worked out depends on the method named on the form.
Straight-line
Each component has its own account. The rule gives the formula in words: "the estimated total replacement cost or deferred maintenance expense of the asset, minus the current reserve balance, divided by the remaining useful life of the asset."5 Take an invented building, Harbor Point, with a roof the study prices at $600,000, a roof reserve of $150,000 and nine years of remaining useful life. The year's contribution is $450,000 divided by nine, or $50,000. An account that has gone negative has to be brought back to zero first.
Pooled
Several components share one account, and the test is cash flow: the opening balance plus projected inflows must equal or exceed projected outflows over the remaining lives of everything in the pool. The rule closes three doors here. A pooled schedule may not include "any type of balloon payments." It may not be "structured in a manner that defers reserve contributions for the purpose of reducing current assessments." And contributions may rise or fall over the schedule to account for inflation or deflation, by no more than the annual change in the Consumer Price Index or the Producer Price Index.5 Components on the SIRS list may be pooled only with each other.3
For a pooled study the form's table has ten rows, Year 1 to Year 10, and five columns: "Required Annual Baseline Funding," "Annual Threshold Funding if Recommended," "Percent Change for Amount from Prior Year," and the inflation and interest percentages, if the preparer used them.6 The form does not define threshold funding. It asks the preparer to state "the annual threshold amount or percentage" used.
Components with no reserve beside them
A blank is not always an omission. The study may recommend no replacement reserve for an item whose remaining useful life is more than 25 years, or whose useful life and cost cannot be estimated, and recommend a deferred maintenance amount for it instead. In the state's rules, deferred maintenance is maintenance or repair done less often than yearly that maintains an asset's useful life.7 If the study recommends reserves for something the statute does not require, that amount has to be "separately identified."3
Study against budget
How does the budget's reserve line relate to the reserve study?
For a building that must have a structural integrity reserve study, the budget's reserves for the study's items must be based on the most recent study, and the amount for each item or group of items must align with it. The association must obtain an updated study before adopting a budget that funds those reserves differently.
The statute says the reserve amount for these items "must be based on the findings and recommendations of the association's most recent structural integrity reserve study."3 The rule goes further: an association "shall not alter or otherwise manipulate the findings of the SIRS," including a remaining useful life or a cost.5 So the study and the budget are meant to carry the same numbers.
The budget has its own page for this. Rule 61B-22.003 requires a schedule that states each reserve account as a separate line with the asset's total useful life, its remaining useful life, its replacement cost or deferred maintenance expense, and the fund balance at the start of the budget period. A pooled reserve gets the same figures for each asset in the pool and one balance.8
Harbor Point, an invented example: one component in the study and in the budget
SIRS, Exhibit Ap. 6
Roof, estimated remaining useful life: 9 years
2027 budget, reserve schedulep. 4
Roof replacement, remaining useful life: 12 years
The money can come from four places: "regular assessments, special assessments, lines of credit, or loans." A special assessment, a line of credit or a loan for these reserves needs a majority vote of the total voting interests, and the study has to be updated to show what the chosen route does to the schedule.3
With the study and the budget side by side
- The kind of study and its delivery date, and whether a later update exists.
- "Current Amount in Structural Reserves" on the form, against the opening fund balance in the budget's reserve schedule.
- The year that matches the budget year in the ten-year table, or the year one amount in a straight-line study, against the budget's contribution to structural reserves.
- Each component's remaining useful life and cost in Exhibit A, against the same line in the budget's schedule.
- The funding method named on the form, against how the budget shows reserves: an account per item, or a pool.
- Reserves the study marks as not required by statute. Different waiver rules apply to them.
- The affidavit's four boxes: special assessment, loan, line of credit or regular assessments, and the amount written beside them.
The lender's test
Does a budget that follows the reserve study satisfy a mortgage lender?
Not by that alone. Florida requires a study to include at least a baseline plan that keeps the reserve balance above zero. Fannie Mae and Freddie Mac look for 10% of budgeted assessment income in reserves, 15% for loan applications dated on or after January 4, 2027, and do not accept a baseline plan in its place. The lender decides.
The state and the mortgage agencies read the same document for different things. Florida asks whether the budget funds what the study found. A lender selling a loan to Fannie Mae or Freddie Mac asks what share of the budget goes to reserves, and may turn to the study when that share falls short.9
Scroll across for all columns.
| Florida statute and rule | Fannie Mae and Freddie Mac | |
|---|---|---|
| What is measured | Whether the budget funds each of the study's items at the study's amount. | The annual reserve allocation divided by annual budgeted assessment income. |
| The minimum | A baseline funding plan: each year's funding "sufficient to maintain the reserve cash balance above zero." | 10% of the budget. 15% for loan applications dated on or after January 4, 2027 (for Fannie Mae, on a Full Review). |
| When a study is used in place of the percentage | Does not arise. The study is the test. | The budget must carry "the highest recommended reserve allocation amount in the reserve study." The baseline method "may not be used to waive" the percentage. |
| How old the study may be | A full study at least every 10 years, with updates between. | Completed within three years of the lender's approval of the project (Fannie Mae). Dated within 36 months of the lender's determination (Freddie Mac). |
| Who prepared it | An engineer, an architect, or a certified reserve specialist or analyst. | An independent third party with expertise in reserve studies. The study must also meet the state's own requirements. |
Section 718.112(2)(g); Selling Guide B4-2.2-019; Lender Letter LL-2026-0310; Freddie Mac Guide 5701.5.11
This is why the two funding columns on the state form matter to a seller. A baseline funding plan is the floor Florida sets, and Fannie Mae describes it as the option "that allows the reserve cash balance to approach but never fall below zero." For loan applications dated on or after August 3, 2026, lenders "are no longer permitted to use" it.10 When a lender runs a Full Review and leans on the study, the question becomes which schedule the preparer recommended beyond the baseline, and which one the budget follows.
RelatedWhat makes a condo non-warrantable: the reserve line and the other project rules a lender checks
Waiving reserves
Which reserves can condo owners vote to waive, and which can they not?
For budgets adopted on or after December 31, 2024, owners in an association that must obtain a structural integrity reserve study may not vote to waive or reduce reserves for the study's items, or to spend them on anything else. Reserves for other items can still be waived or reduced by a majority of all voting interests.
A budget adopted before that date could waive them on a majority vote of all voting interests.2 The statute still allows that for items outside the SIRS list, and the rule limits such a vote to one annual budget at a time.5 For the study's items the exceptions are few: a pause of up to two budgets after a milestone inspection, a natural emergency that leaves the whole building uninhabitable, a vote to terminate the condominium, and an alternative funding method the Division approves for a multicondominium.3 Each has conditions, set out on the page for section 718.112(2).
For a reader of the study this is why one yes-or-no box on the form matters. Reserves the study recommends for items the statute does not require are listed separately, and those are the reserves in it that owners may still vote to waive or reduce.6
The dates in this section are collected, with their sources, in Florida condo and mortgage deadlines for 2026 and 2027.
The affidavit
What does an association file with the state after a reserve study?
Within 45 days of receiving the study, an association must give each owner a copy or a notice that it is available, and report completion to the state. An officer or director signs DBPR Form 6000-11, the Affidavit of Acknowledgement, stating the study's cost and whether its schedule will result in a special assessment, loan or line of credit.
The affidavit is one page, signed by an officer or director who acknowledges receiving the completed study.12 It records the date the study was delivered to the association, the date and method by which owners were sent it, and what it cost. Then it asks what the reserve schedule "will result in," with four boxes: Special Assessment, Loan, Line of Credit, Regular Assessments. A line beside them takes the "Amount of Special Assessment/Loan/Line of Credit Required."
The clocks a delivered study starts
- DeliveryThe preparer signs, dates and delivers the studyThe "SIRS Delivery Date" on the form's first page.
- Within 45 daysOwners are told, and the state is toldA copy to each owner, or a notice that the study can be inspected and copied on written request. A statement of completion, with the affidavit, through the association's online account with the Division.
- Within 36 monthsA financial update needs no new site visitCounted from the completion of the study that held the most recent visual inspection, and only for changes to funding amounts or replacement costs.
- Within 10 yearsThe next full studySooner if the rule's update triggers are met.
The Division publishes two lists of associations that have reported a completed study, one of reports made before July 2025 and one of reports from July 2025.13 It says entries are "displayed exactly as submitted." A row gives a project, an association, a city, a zip code and a county, and no date. The lists show that a study was reported. They do not show when it was done or what it found. The two lists are counted by county on Florida reserve study filings by county.
Getting a copy
How does a buyer or an owner get a copy of the reserve study?
A resale buyer under contract is entitled, at the seller's expense, to the association's most recent structural integrity reserve study or a statement that none has been completed. An owner receives a copy or a notice within 45 days of delivery, and an association of 25 or more units must post the study on its owner website.
For a buyer the study arrives in the resale package, with the declaration of condominium, the bylaws and rules, the annual financial statement and budget, the association's question and answer sheet and the state's governance form.1 Each item, with the paragraph that requires it, is on the Florida condo resale document checklist.
An owner has two more routes. The most recent study is on the list of documents an association of 25 or more units must post behind its owner login, beside the budget and the inspection reports. And it is an official record, which the association must keep for at least 15 years after the study is completed and which is open to inspection by any owner.1
The guide to buying a condo in Florida covers the rest of the package and the seven days a buyer has to read it.
More questions
- Does a condo building under three stories need a reserve study?
- Not a structural integrity reserve study. Section 718.112(2)(g) does not apply to buildings less than three stories in height. The budget still has to carry reserves for roof replacement, building painting, pavement resurfacing and any item above the $25,000 threshold, and owners may vote to waive or reduce those.
- Can a milestone inspection stand in for the reserve study's inspection?
- It can stand in for the visual inspection portion. Section 718.112(2)(g)8. allows it where the milestone inspection, or one done for a similar local requirement, was performed within the past 5 years and meets the paragraph's requirements. The financial part of the study is still required.
- How old can a reserve study be for a lender?
- Fannie Mae lets a lender review the most current study or update if it was completed within three years of the date the lender approves the project. Freddie Mac's wording is dated within 36 months. Florida's 10-year cycle for a full study is a separate rule.
- What is the $25,000 threshold?
- It is the cost above which an item must be reserved for. Section 718.112(2)(f) sets it at $25,000 and tells the Division to adjust it each year for inflation and to post the adjusted amount on its website by February 1.
- Can Lysting tell me whether a building's reserves are enough?
- No. The Condo package review sets what the reserve study, the milestone report, the budget and the minutes say side by side, with page references, and shows where they differ. What a component will cost is the preparer's finding, how to fund it is the association's decision, and whether a budget meets a loan's rules is the lender's.
Sources
Every rule, date and limit above comes from one of these. The examples marked invented use invented figures. Where a rule is quoted, the wording is the source's.
- 1Florida Statutes chapter 718, Condominium Act: ss. 718.103(28), 718.111(12), 718.503Florida Legislature, 2026 Statutes
- 2Inspections: milestone inspections and structural integrity reserve studiesFlorida Department of Business and Professional Regulation, Page as of November 16, 2026
- 3Florida Statutes s. 718.112(2)(f) and (g), annual budget, reserves and the structural integrity reserve studyFlorida Legislature, 2026 Statutes
- 4Florida Statutes s. 553.899, Mandatory structural inspections for condominium and cooperative buildingsFlorida Legislature, 2026 Statutes
- 5Florida Administrative Code rule 61B-22.005, ReservesFlorida Department of State, Amended effective October 4, 2026
- 6DBPR Form CO 6000-10, Structural Integrity Reserve Study (SIRS) FormFlorida Department of Business and Professional Regulation, Effective August 2026
- 7Florida Administrative Code rule 61B-22.001, DefinitionsFlorida Department of State, Last amended December 23, 2002
- 8Florida Administrative Code rule 61B-22.003, BudgetsFlorida Department of State, Last amended December 23, 2002
- 9Selling Guide B4-2.2-01, Full Review ProcessFannie Mae, Guide of November 4, 2026
- 10Lender Letter LL-2026-03, Updates to Project Standards and Property Insurance RequirementsFannie Mae, March 18, 2026
- 11Seller/Servicer Guide 5701.5, Established Condominium ProjectsFreddie Mac, Effective August 3, 2026; revised version effective January 4, 2027
- 12DBPR Form 6000-11, Affidavit of AcknowledgementFlorida Department of Business and Professional Regulation, Effective August 2026
- 13SIRS Reporting and DatabaseFlorida Department of Business and Professional Regulation, Page and lists as of November 16, 2026
This guide states what the published rules and forms say. It is not legal, lending, insurance, engineering or valuation advice, and it does not decide anything about a particular property. Rules change; read the source, and ask the person named in each section.