Fannie Mae Selling Guide B4-2 and B7-3: the condo project standards a lender applies, as published November 4, 2026
Selling Guide published November 4, 2026Checked against its source on
What the Selling Guide says
Fannie Mae's Selling Guide sets the standards a lender applies to a condominium project before it sells a unit's loan to Fannie Mae. The Guide of November 4, 2026 looks for a budget putting at least 10% toward replacement reserves. For loan applications dated on or after January 4, 2027 the minimum is 15%. The lender decides.
The operative words, quoted from the guide as published:
To determine whether the association has a minimum annual budgeted replacement reserve allocation of 10%, the lender must divide the annual budgeted replacement reserve allocation by the association’s annual budgeted assessment income (which includes regular common expense fees).
We are revising our reserve allocation requirement for capital expenditures and deferred maintenance from a minimum of 10% to a minimum of 15% of the annual budgeted income assessment.
Lenders must comply with this requirement when utilizing the Full Review process for all loan applications dated on or after Jan. 4, 2027.
The budget must include the highest recommended reserve allocation amount in the reserve study to adequately cover the costs identified. Although reserve studies may establish a reserve funding goal that allows that reserve cash balance to approach, but never fall below, zero during the cash flow projection (often referred to as the baseline funding method), this method may not be used to waive the 10% reserve requirement
No more than 15% of the total units in a project are 60 days or more past due on common expense assessments (also known as HOA fees).
The master property insurance policy must provide coverage on a replacement cost basis, with the exception of roofs.
Scroll across for all columns.
| Subject | What the Guide says | Where |
|---|---|---|
| Replacement reserves | A budget that funds replacement reserves of at least 10%, measured against annual budgeted assessment income. A minimum of 15% for loan applications dated on or after January 4, 2027 under Full Review. | B4-2.2-01; LL-2026-03 |
| A reserve study in place of the percentage | The Guide has the budget include the study's highest recommended reserve allocation. The baseline funding method may not be used. The study or its update is one completed within three years of the date the lender approves the project. | B4-2.2-01 |
| Assessments past due | No more than 15% of the total units 60 days or more past due on common expense assessments, and no more than 15% past due on each special assessment. | B4-2.2-01 |
| Commercial space | No more than 35% of the project, or of the building it is in, as commercial space or allocated to mixed use. | B4-2.1-03 |
| Units held by one entity | More than 20% of the units in a project of 21 or more units, more than 2 units in a project of 11 to 20, and more than 2 units in a project of 5 to 10 that is part of a master association. The Guide lists a project held that way as ineligible. | B4-2.1-03 |
| Litigation | The Guide lists as ineligible a project whose association is named as a party to pending litigation, or the sponsor or developer is named in pending litigation that relates to the safety, structural soundness, habitability or functional use of the project. The Guide lists minor matters that are excepted. | B4-2.1-03 |
| Critical repairs | Among the listed conditions: unfunded repairs costing more than $10,000 per unit to be undertaken within the next 12 months, and a partial or total evacuation order for the project's buildings. The lender obtains and reviews a structural or mechanical inspection completed within 3 years of its review. | B4-2.1-03 |
| Master property insurance | Coverage on a replacement cost basis, with the exception of roofs. A maximum deductible of 5% of the coverage amount per occurrence, and a maximum per unit deductible of $50,000. | B7-3-03 |
| Projects with no project review | A unit in a two- to four-unit project, a unit in a five- to ten-unit project that is not part of a larger development or master association, and a detached unit. | B4-2.1-02 |
| Limited Review | Retired for all loan applications dated on or after August 3, 2026. Established projects go through Full Review or, where it applies, the waiver. | LL-2026-03 |
A summary of the Guide's own lines for reading beside a set of documents. The Guide's words govern, and the Guide's text still reads 10% for reserves until the January 4, 2027 change is written into it.
When it applies from
the Selling Guide: its dates
- March 18, 2026Fannie Mae issued Lender Letter LL-2026-03, Updates to Project Standards and Property Insurance Requirements.
- August 3, 2026Limited Review is retired, and the baseline funding method may no longer be used, for all loan applications dated on or after this date.
- November 4, 2026The edition of the Selling Guide this page states was published.
- January 4, 2027The minimum replacement reserve allocation is 15% for loan applications dated on or after this date, where the lender uses Full Review.
Which documents show it
- The annual budget
- The replacement reserve allocation and the budgeted assessment income it is measured against.
- The reserve study
- The recommended reserve allocations by funding schedule, and whether the budget carries the highest of them or follows the baseline schedule.
- Board minutes
- Special assessments levied, voted or discussed, and litigation the association is a party to.
- The master insurance declaration pages
- The basis of loss settlement, the deductible per occurrence and any per unit deductible.
- The milestone inspection report or summary
- Repairs the inspector names, and whether the budget funds them.
Which report reads against it
Lender readiness report$299 per report
Selling a condo a buyer may need to finance.
What the report shows
- The reserve line as a share of budgeted assessments, beside Fannie Mae's 10% line and the 15% line for loan applications dated on or after January 4, 2027
- Which of the reserve study's funding schedules the budget follows, and whether it is the baseline schedule
- Special assessments levied, voted or discussed in the minutes
- Litigation named anywhere in the documents
- Master insurance: the replacement cost basis, the per-unit deductible beside the $50,000 limit, the deductible beside the limit of 5% of coverage, and the hurricane deductible
- Milestone inspection status, the repairs it names and whether the budget funds them
- Whether the association appears in the state's reserve study filings and in HUD's public condominium lookup
Lysting does not give legal, lending or engineering advice. It shows what the documents say, side by side, and names who decides.
Who decides how it applies
Source
Every quotation, figure and date on this page comes from one of these. The wording of each quotation is the source's.
- 1Selling Guide B4-2.2-01, Full Review ProcessFannie Mae, published November 4, 2026
- 2Lender Letter LL-2026-03, Updates to Project Standards and Property Insurance RequirementsFannie Mae, March 18, 2026
- 3Selling Guide B4-2.1-03, Ineligible ProjectsFannie Mae, published November 4, 2026
- 4Selling Guide B7-3-03, Master Property Insurance Requirements for Project DevelopmentsFannie Mae, published November 4, 2026
- 5Selling Guide B4-2.1-02, Waiver of Project ReviewFannie Mae, published November 4, 2026
- 6Condo Status FinderFannie Mae, as published on November 16, 2026
This page states what the published text says. It is not legal advice, and it does not decide anything about a particular property. Rules change: read the official text, and ask the person named above.